Bathroom renovation

€100

Description

I need to remove the Bathtub from the family bathroom, replace it with a new shower Panel and glass door for walk in shower. The Bath tub to be removed and disposed to any acceptable location as i dont have place to dispose the bath tub. Then fit some small cabinets and lights in the bath room

Task Location: Johnstown, Enfield, Co. Meath
Due date: Flexible
Date Posted: 23 Sep 2025
Posted by:

Comments & Offers

Paul M. 5 hours ago

If you don't want to fit more floor tiles where the bath was, and instead put in a bigger tray but still you can't show if there's enough space to fit the tray against the door, then I don't think you understand the amount of work involved.

Paul M. 5 hours ago

I'm withdrawing from the job. There's not enough information about if it's practical to replace the bath with a shower tray. its important to see what if any space is between the bath edge and the bathroom door.

Paul M. Made an offer 5 hours ago
Paul M. 7 hours ago

Ok

Arindam S. 8 hours ago

@Paul M. Great. I will accept the offer and put the 15 euro deposit and we exchange contact details accordingly

Paul M. 8 hours ago

Ok that's fine I can come Sunday morning

Arindam S. 8 hours ago

@Paul M. Hi Paul The door frame is just on middle of the bath frame. The door is not on side of the bath frame but it rests on the bath tub frame. I am home Sunday 9 am till 12 noon. Please let me know if you can visit I will accept th offer and pay the 15 euro fee if suits you the time

Paul M. Made an offer 13 hours ago
Arindam S. 13 hours ago

@Paul M. I have reduced the offer now. If you accept and then let me know when you can visit

Paul M. 13 hours ago

In the photo, is that the door to the right side of the bath? Then there's no extra space to fit the shower tray.

Paul M. 13 hours ago

The bath is 700mm wide. A tray will be 800mm wide. Is there 100mm between the edge of the bath and the edge of the door frame?

Paul M. Made an offer 13 hours ago
Arindam S. 13 hours ago

@Paul M. Yes. The floor tiles is needed .. I don't have the same floor tiles. Either we have to get floor tiles done for the remainder area left after shower tray or get a shower tray rectangle in shape which covers the entire area for the bath tub. It will be good if you can do a call out

Paul M. 16 hours ago

I suppose there's floor tiles on the rest of the floor? So when the bath is removed the rest of the floor where bath was needs to be tiled. Can you get the same extra floor tiles?

Arindam S. 19 hours ago

@Zak N. . Pics uploaded The tiles need. To be done only on the lower part after removal of the bath tub Please check and advise. The bath tub also needs to be removed and disposed as I don't have place to dispose it. The shower panel will be purchased and approx size will be 80*80 The quote here will be rough as once a visit is done this can be finalised I am happy to accommodate a call out if needed

Arindam S. 19 hours ago

@Thomas K. Pics uploaded The tiles need. To be done only on the lower part after removal of the bath tub Please check and advise. The bath tub also needs to be removed and disposed as I don't have place to dispose it. The shower panel will be purchased and approx size will be 80*80 The quote here will be rough as once a visit is done this can be finalised I am happy to accommodate a call out if needed

Arindam S. 19 hours ago

@Paul M. Pics uploaded Tiles are already in place. Need some tiles to be done on the lower side(3 sides) after taking out the bath tub Please check and let me know an offer for the labour. This should include disposing the bath tub as well

Thomas K. Made an offer yesterday
Paul M. yesterday

What sort of small cabinets and lights do you want installed?

Paul M. yesterday

Depends on few things. What size shower tray do you want to fit? Will it be 800x800 or something similar to the length of the bath? Also the wall where the bath was will all have to be tiled. Upload photos of the existing bathroom and answer the my questions. Thanks

Arindam S. yesterday

@Paul M. Yes Paul. That's correct Can you give me an approx idea of the labour cost please

Paul M. yesterday

Aridam the wall between the top of the bath and the new shower tray will need to be covered with usually tiles. This needs to be done which you haven't included. This is extra work too.

Arindam S. yesterday

@Zak N. Hi Zak, Can you give me an approx idea for the work please and if all good then can arrange an appointment with you if the Labour cost is acceptable for me please

Zak N. 2 days ago

Hi Arindam, If your budget for labour is €350 I can guarantee, you will not get anyone to do it for you. I'm not sure you understand the amount of work that needs doing.

Arindam S. 2 days ago

@Zak N. Hi Zak.. for the entire works I have put budget. Materials for new shower panel from bnq wil be extra and paid by meas you need

Thomas K. 2 days ago

Any photos thanks

Zak N. 2 days ago

Hi Arindam, What is your budget? Thank Zak