We use cookies to improve your site experience. Learn about our cookie usage.
You can accept or decline certain cookie useage cases from this form below:
You can find out more about the cookies we use in our Privacy policy.
Fix fireplace hearth 2. Grouting in kitchen and bathroom 3. Hang blind 4. Put up a light fitting 5. Install shelf or box in wires below TV 6. Touch up paint (bathroom, windows, edges) 7. Cut and paint bench seat top 8. Fix front and back doors which are sticking in the heat, UPVC 9. Mount TV to wall 10. Fix bathroom plugs
@Thomas K. Hi Thomas, thanks for your reply, just want to check would materials be included?
Hi Emma, I'm sorry I don't have anything until the last week of July I'm afraid.
Leave it with me Emma and I'll come back to you later. I need to check my diary
@James L. Hi, we are looking to sell and need to do photos of the house around 8-9th of July some of the jobs would be better to have done before the photos other could wait as the are more important for viewings and engineers/ surveyors report. Would it be possible for you to do it that way or would you definitely not have capacity till end of July?
@Donagh M. The concrete of the hearth is cracked and it looks scruffy, it needs to be fixed
What’s wrong with the fireplace hearth
@James L. Hi James, in bathroom it is around the edge of the bath that needs to be redone the silicone has lifted so would need to be removed and new silicone put on. In kitchen grouting is missing for a few small sections of the worktop
Hello Emma, in relation to the grouting, is it remove old and replace or new tiling to be finished?