The kitchen laminated floor need to be removed and replaced with new tiles. So the kitchen need to removed out in order to install new tiles on the kitchen floor area. Red marked area need to be taken out.
@Maxim B. i have another person to do tiles.
Sorry, I misunderstood your request. I can only disconnect the tap, cap off the hot and cold water lines to prevent any leaks, and move the kitchen units aside. You will need to find another person to install the new floor tiles for you."
@Maxim B. Can you disconnect the tap, and securely cap off both lines (hot and cold) so that the mains water can be turned back on for the rest of the house without leaks. No no electrical and disposal work needed. You you just need to put the units aside in the other side of the kitchen area.
Hi, The job involves: - Removing kitchen cabinets - Removing laminate - Tiling the floor - Re-installing kitchen This is 2-3 days work and the price is for labour only (materials not included - tiles, adhesive and grout to be supplied by you). I am available next week anytime you want. Thanks, Catalin
Ok thats fine i can take out to be re used no problem
@Ronan F. The kitchen will be reused again, it's new, only take out to install tile
That kichen should be used again?
Is the kitchen being disposed of have you a skip onsite?
@Tornike M. Tomorrow or Thursday
Hi, when do you need that job?